Project: BobCollins   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Bob Collins   -  
Project:   Vans - RV-12iS   -   VIEW REPORTS
Total Hours:1059
Total Expense:$101645.34
Start/Last Date:Jan 04, 2017 - No Finish Date
Engine:Rotax 912iS
Propeller:Sensenich
Panel:Dual screen G3X, autopilot
 
Friendly URL: https://eaabuilderslog.org?s=BobCollins

Home or Last Project Picture

Apr 01, 2018     Completed Section 23 - (3 hours)       Category: Fuselage
I finished the vent doors by priming the doubler frame and then riveted it to the fuselage on both sides. While I waited for primer -- and then hammered finish -- to dry on each side, I cut the hinge to 10" for the cowling attach point. I couldn't find a piece so I cut another 10" piece for the left side so I may have to order new hinge material later depending on how the rest of this goes. No big deal.

I drilled the hinge and shim piece to each side and then riveted them.

But the time all that was done, all the paint was done on the vent door material so riveted all that on and then assembled the vent doors with the called-out hardware.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.